Haro were engaged to complete the detailed design and documentation for the esplanade in Palm Island, this involved investigating the removal of the current bitumen road and replacing it with a concrete road (600m), installing pedestrian footpaths throughout to improve pedestrian movements and the detailed design of the associated intersection (Beach Road, Pryor Road, Main Street). As part of detailed design, Haro was asked to investigate the existing Stormwater and improve the Hydraulic performance of the section of road by regrading the road to better utilise the existing pits.

Client – Revere Projects Location – Palm Island