Haro was engaged to complete the detailed design and documentation of approx. 500m of Rock Armour Sewall on Palm Island. This included ensuring that the Seawall met Wave modelling results, tied into existing seawalls in the area, ensured all existing services, mangroves and stormwater were unaffected. As part of this design, Haro were asked to investigate the existing Hydraulic network and ensure that the seawall met its requirements with the installation of wier to accommodate for Q50 storm events.

Client – Revere Projects Location – Palm Island